DOTr and DPWH officials reiterate commitment to complete NLEX Harbor Link Segment 10 in December

Public Works Secretary Mark Villar (2nd from right) reiterated his commitment to complete the construction of the NLEX Harbor Link Segment 10 before the year ends. The same assurance was echoed by Transportation Secretary Arthur Tugade (3rd from left) during the recent site inspection of the Duterte administration’s “Build Build Build” team to the NLEX Harbor Link Segment 10.

Featured as one of the big-ticket projects in the “Build Build Build” infrastructure plan, the NLEX Harbor Link Segment 10, is a 5.7-km elevated expressway which traverses Karuhatan in Valenzuela City, Governor Pascual Avenue in Malabon City, and C3 road in Caloocan City.

Segment 10 is envisioned to alleviate traffic congestion and drive commerce between the Harbor area and Central and North Luzon. It is seen to advance transport logistics and facilitate efficient delivery of goods. Once opened, travel time from the Manila Port to the NLEX will take only 10 minutes.

Hosting the site inspection are Metro Pacific Investments Corporation (MPIC) Chairman Manuel Pangilinan (right), together with MPIC President Jose Ma. Lim (2nd from left) and Metro Pacific Tollways Corporation (MPTC) President Rodrigo Franco (left). Also in photo is Bases Conversion and Development Authority President Vince Dizon (4th from left).

WP2Social Auto Publish Powered By : XYZScripts.com
https://m.youtube.com/c/iorbitnews